Diamond drill equipment operating in the mountainous terrain of the Thor Project

Exploration Targets · Beyond the Resource

Targeting district-scale growth.
Four distinct opportunities.

Nearly two decades of drilling and fieldwork at Thor now inform a wider exploration campaign across the consolidated Silver Cup Mining District.

Priority targets
4
Land position
6,400+ ha
Mineralized corridor
14 km

Exploring the wider system

From a defined deposit to a district-scale search

The near-surface Thor deposit provides a detailed geological reference point. Taranis is applying that knowledge to targets lateral to and beneath the classified Mineral Resource.

The working model interprets Thor as the upper-level expression—the “Trunk”—of a much larger magmatic-hydrothermal system. Deep geophysics identifies the conceptual intrusive “Elephant” and alteration “Tusks,” while structural work defines opportunities along the broader Silver Cup Anticline.

Each target presents a different geological question. Target dimensions and comparisons describe exploration concepts, not Mineral Resources or estimates of contained metal.

Overview map showing the Borr, Nortran, One O'Clock and Ram exploration targets around Thor Expand target map
Priority-target overview. Target boundaries and subsurface interpretations are conceptual and require drill testing.
50+historic mines and prospects within the district compilation
2.8 kmdefined near-surface Thor epithermal trend
4 kmconceptual strike potential toward Ram if continuity is demonstrated
1integrated district-scale geological framework
Target 01

Down-dip continuation

Borr Zone

A drill-confirmed occurrence east of the lamprophyre dyke, testing whether the Thor epithermal system continues down-slope toward the Silver Cup Anticline.

The geological thesis

A displaced segment of the Thor system

Three-dimensional modelling indicates that a younger, steeply dipping lamprophyre dyke cuts the original epithermal system. The Borr Zone is interpreted as mineralization displaced to the east and down-dip of the main Thor deposit.

The interpretation would connect the otherwise “rootless” near-surface Thor mineralization toward the plunging Silver Cup Anticline. Additional drilling is required to establish geometry and continuity.

Video thumbnail for the Borr target technical analysis Technical analysis Official YouTube ID required
Borr target analysisDoubling the mineral deposit with Thor's “Brother Resource”?
01 · Discovery intercept

Thor-256

5.25 m grading 26.2 g/t silver, 0.163 g/t gold and 3.55% combined lead and zinc.

02 · Mineralogy

Massive sulfides

Pyrite, sphalerite, galena and tetrahedrite within strongly altered metasedimentary rocks.

03 · Geophysical extent

Prominent magnetic low

The prospective trend extends well beyond the discovery intercept and provides a corridor for follow-up work.

04 · Conceptual scale

Large search area

If contiguous, the modelled Borr exploration area is approximately five times the footprint of the existing Thor deposit.

Target caution: The five-times comparison relates to conceptual exploration area, not tonnage, grade, economic value or a Mineral Resource.

Target 02

Fault-displaced extension

Nortran

The former Western Deeps target tests whether the missing western portion of Thor was displaced downward across the Ripper Fault into the Horton Area.

The geological thesis

Following the western edge of the dyke

Mapping completed in 2022 identified the northwest-trending, near-vertical Ripper Fault along the western margin of the lamprophyre dyke. The working interpretation is that this structure truncated Thor and down-dropped part of the system into the parallel Horton valley.

The boulder field, terrain position and clusters of conductive anomalies provide independent evidence for an undiscovered bedrock source west of the known deposit.

Video thumbnail for the Nortran target technical analysis Technical analysis Official YouTube ID required
Nortran target analysisDid a fault hide the richest part of this deposit?
01 · Surface evidence

100+ boulders

A train of mineralized float ranges from small boulders to car-sized blocks across the Horton Area.

02 · Reported assays

High-grade float

Selected boulders reportedly returned values up to 14.55 g/t gold and 1,705 g/t silver.

03 · Terrain constraint

Uphill from Thor

LiDAR indicates the boulders could not have travelled downhill from the existing Thor deposit.

04 · Geophysical fingerprint

19 EM anomalies

Irregular conductive responses provide multiple discrete areas for follow-up beneath cover.

Sampling caution: Float-boulder assays are selective samples and may not represent the grade or continuity of an undiscovered bedrock source.

Target 03

Deep magmatic connection

One O'Clock

A conceptual deep target at the interpreted junction between the I-1 resistive feature and the plunging Silver Cup Anticline.

The geological thesis

Testing the possible heat engine

In a linked porphyry-epithermal model, distal precious-metal veins may be sourced from a deeper intrusive system. One O'Clock occupies the northeast contact area between the interpreted I-1 body and the anticlinal structure that controls much of the district's historic mineralization.

The target is visible through integrated deep-penetrating MobileMT inversion rather than surface exposure. Its geological nature can only be determined through additional work and drilling.

Video thumbnail for the One O'Clock target technical analysis Technical analysis Official YouTube ID required
One O'Clock target analysisThe “missing link” in a linked porphyry-epithermal system?
01 · I-1 feature

1.3 km diameter

A circular resistivity high interpreted from the airborne MobileMT dataset.

02 · Alteration halo

Approximately 2 km

A conductive envelope—the conceptual “Tusks”—surrounds the resistive feature.

03 · Structural position

Northeast contact

The target occupies a modelled junction with the plunging Silver Cup Anticline.

04 · Supporting geology

Contact alteration

Peripheral drilling intersected monzodiorite dykes and propylitic contact-metamorphic alteration.

Three-dimensional interpretation of Thor, I-1 and the Silver Cup Anticline Expand 3D model
Subsurface features are geophysical and geological interpretations. I-1 and One O'Clock are exploration targets, not Mineral Resources.
Target 04

Northern frontier

Ram

A concealed northern continuation target extending beyond Thunder and beneath post-mineral landslide debris on Thor's Ridge.

The geological thesis

Looking beneath the rockslide

Historic exploration stopped where prospective bedrock disappeared beneath extensive slide material. Modern LiDAR reveals the scale of this younger cover and allows old soil and till datasets to be reinterpreted in their proper terrain context.

The Thunder discovery provides an analogue: high-grade epithermal mineralization was found beneath slide cover on the southern flank of Thor's Ridge. Ram applies that exploration model farther north.

Video thumbnail for the Ram target technical analysis Technical analysis Official YouTube ID required
Ram target analysisWhat's beneath the rockslide?
01 · Historic intelligence

1980s datasets

Public Westmin and Ram Explorations soil and till data have been compiled and digitized.

02 · Silver response

Up to 211 g/t Ag

A reported till sample at the slide toe returned a highly anomalous silver value; multiple soils returned 5–7 g/t silver.

03 · Exploration analogue

Thunder Zone

The 2021 discovery demonstrates that mineralization can be preserved beneath rockslide cover.

04 · Corridor test

Up to 4 km

Successful drilling could test whether the epithermal trend extends northward beyond the current deposit.

Geochemical caution: Historic soil and till results are exploration indicators. They do not demonstrate the grade, thickness or continuity of mineralization in bedrock.


District map showing exploration targets surrounding the Thor deposit

Unlock the district

Explore the technical foundation behind the targets

Review the classified Mineral Resource, the bulk-sample program and current corporate materials alongside the district-scale exploration thesis.

Exploration targets are conceptual in nature. There has been insufficient exploration to define a Mineral Resource at Borr, Nortran, One O'Clock or Ram, and it is uncertain whether further exploration will result in a Mineral Resource.